Mobile
Log In Sign Up
Home > english-chinese > "peak flow" in Chinese

Chinese translation for "peak flow"

高峰流量
洪峰流量
尖峰流量
最大流量
最高流速


Related Translations:
peak to:  peak峰到峰peak峰间值peak峰一峰值peak峰至峰peak最大电压波动正负峰间波动峰间值
peak scours:  泥炭冲洗
peaking network:  峰化网络高频补偿网络高频建峰网络建峰网络
peak resolution:  峰分辨度
rider peak:  驼峰
unresolved peak:  未分辨的峰值
peak stripping:  谱峰剥离
attenuation peak:  衰减峰
escape peak:  逃逸峰小峰泄漏峰
mcdouall peak:  麦克道尔皮克
Example Sentences:
1.Rossi - peakes flow test
罗西皮克斯流动试验
2.Peak flow meter
最大呼气流量计
3.The researchers also predict that by the middle of the century , melting snow will cause streams to reach their annual peak flow up to a month earlier
研究者们还预测,到本世纪中叶,融化的积雪将导致河流量提前一个月达到其年高峰值。
4.Wastewater collected from canteen kitchens , including that from basins , sinks and floor drains shall be fitted into foul sewer via grease traps capable for providing at least 20 minutes retention during peak flow
来自食堂厨房的废水,包括来自水池、水槽和地面排水管的,应经由最大流量时能够保持20分钟的集油器,排入污水下水道。
5.It is verified by the observed data of xianing port area in changsha city that the model is of high accuracy , with the greatest relative error of the peak flow of only 7 . 85 % , thus can be used in runoff simulation of harbor rainfall drainage system
经长沙市霞凝港区的实测资料检验,证明该模型在港区小流域的雨洪分析中有较高的精度,洪峰流量最大相对误差仅为7 . 85 % ,可用于港区雨水排水的径流模拟。
6.Results showed , taking jia - lu - he catchment as example , that the integrated control of soil and water loess could reduce the flood - peak flow and flood water amount , that the flow process has been prolonged and that the peak flow was postponed
提出了水土流失综合治理对大中流域暴雨洪水影响的研究方法。以佳芦河为例,分析表明:水土流失综合治理使暴雨洪水的洪峰流量、洪水总量降低,洪水过程持续时间延长,洪峰滞后。
7.The objective of the optimal model is to keep the flood process mode similar and subject to restrictions of the actual peak flow discharge and flood volume in different period of time , the ga and prsaa that have global optimal capabilities are used to solve the model in this paper
在满足洪峰流量约束和分时段洪量约束条件下,本文建立了以洪水过程模式尽量相似为目标的洪水过程放大优化模型,并采用具有全局搜索能力的遗传算法和并行组合模拟退火算法求解该模型。
8.The simulative calculation results show that all the three measures mentioned herein have larger effects on the infiltration , runoff , flood peak flow and overland flow and can greatly alleviate the pressure of the draining pipeline , clip the flood peak and increase the infiltration as well , if they are taken as the additional important measures of urban drainage for flood control
模拟计算的结果显示,以上3种方式对入渗、径流、洪峰流量、坡面流等均有较大影响,作为城市防洪排水的重要辅助措施,可以极大地缓解排水管道压力,同时削减洪峰、增加入渗。
Similar Words:
"peak firing rate" Chinese translation, "peak firing temperature" Chinese translation, "peak flame temperature" Chinese translation, "peak flatness" Chinese translation, "peak flood" Chinese translation, "peak flow dial" Chinese translation, "peak flow discharge" Chinese translation, "peak flow mete" Chinese translation, "peak flow meter" Chinese translation, "peak flow modulus" Chinese translation